Plumbing & Lighting Fixture Schedule Builder

Build a room-based plumbing and lighting fixture schedule with finish, model, installation dimensions, and decision dates.

Identify trim and rough-in separately

Use separate item codes for the visible trim and the compatible rough-in or valve body. Record connection sizes in dimensions, and ask the installer to confirm compatibility against the current manufacturer documentation.

Give lighting vendors the exact finish and configuration

Use the quoted SKU and include lamp or driver information in the finish field when the vendor SKU does not encode it. Set the decision date ahead of the electrical rough-in, with time to verify mounting and clearances.

Frequently asked questions

Can fixtures share a schedule with furniture?

Yes. Each selection is grouped by room, so plumbing, lighting and furniture can sit in the same project.

Is there a fixture example?

The Kitchen & Bath Fixture Schedule preset includes faucets, valves, pendants, sconces, and a substitution.

FF&E specification guides

FF&E Schedule Excel & Client Approval PDF MakerBackorder Substitution Approval Sheet for DesignersHospitality FF&E Procurement Schedule TemplateTrade vs Retail Markup FF&E CalculatorDesignFiles & Aalto Alternative for Small StudiosRoom-by-Room Client FF&E Approval BookVendor & Contractor FF&E Procurement ScheduleFF&E Specification Sheet TemplateResidential Living & Dining FF&E ScheduleFF&E Sourcing Spreadsheet & CSV ImportFF&E Decision Dates and Lead-Time PlanningFF&E Vendor Rollup Excel TemplateFF&E Finish and Fabric Schedule for InteriorsFF&E Client Budget Approval TemplateFF&E Substitution Budget & Lead-Time Variance ReportInterior Design FF&E Procurement HandoffFF&E Approval Revision Checklist