Interior Design FF&E Spec Sheet Generator

Turn a sourcing sheet into a client approval book, vendor schedule, and backorder report.

  • Client PDF
  • Vendor PDF + Excel
  • Substitution variance

Spec workbench

Drafts stay in this browser.

Rev 1 · 2 rooms · 1 alternate

Selections 18 / 100

Living Room10 selections
Dining Room8 selections

Live preview

Updates with your selections
Hartwell StudioRev 1 · USD

Westfield Residence

Client FF&E approval book

Prepared for Morgan & Ellis

Living Room

LR-01 · Soren modular sofa$3,300.00

Oat linen / walnut · 98 × 38 × 32 in

1 × $3,300.00 · 12 wk · Due 2027-01-15 · Approved

Soren stocked sofa · -$225.00 · -8 wk

LR-02 · Arden lounge chair$2,200.00

Cognac leather / oak · 29 × 32 × 31 in

2 × $1,100.00 · 8 wk · Due 2027-01-15 · Pending

LR-03 · Travertine coffee table$925.00

Honed ivory travertine · 48 × 24 × 15 in

1 × $925.00 · 6 wk · Due 2027-01-15 · Pending

LR-04 · Turned oak side table$700.00

White-oiled oak · 18 Ø × 21 in

2 × $350.00 · 4 wk · Due 2027-01-15 · Pending

LR-05 · Loomed wool rug$1,225.00

Natural wool · 9 × 12 ft

1 × $1,225.00 · 5 wk · Due 2027-01-15 · Pending

LR-06 · Arc reading floor lamp$575.00

Aged bronze · 18 × 42 × 68 in

1 × $575.00 · 7 wk · Due 2027-01-15 · Pending

LR-07 · Linen drapery panel$1,475.00

Flax / blackout lining · 54 × 108 in

4 × $368.75 · 8 wk · Due 2027-01-15 · Pending

LR-08 · Oak media credenza$1,950.00

Fumed white oak · 72 × 18 × 24 in

1 × $1,950.00 · 10 wk · Due 2027-01-15 · Pending

LR-09 · Bouclé lumbar cushion$262.50

Sand bouclé · 22 × 12 in

3 × $87.50 · 2 wk · Due 2027-01-15 · Pending

LR-10 · Glazed stoneware vessel$137.50

Salt glaze · 12 Ø × 14 in

1 × $137.50 · 3 wk · Due 2027-01-15 · Pending

Dining Room

DR-01 · Oval pedestal dining table$2,225.00

Filled travertine · 82 × 40 × 30 in

1 × $2,225.00 · 10 wk · Due 2027-01-15 · Approved

DR-02 · Cane-back dining chair$2,475.00

Oak / natural cane · 19 × 22 × 33 in

6 × $412.50 · 6 wk · Due 2027-01-15 · Pending

DR-03 · Linear pendant$737.50

Burnished bronze · 48 × 8 × 9 in

1 × $737.50 · 7 wk · Due 2027-01-15 · Pending

DR-04 · Dining sideboard$1,487.50

Ribbed walnut · 63 × 18 × 29 in

1 × $1,487.50 · 9 wk · Due 2027-01-15 · Pending

DR-05 · Pleated wall sconce$437.50

White linen / brass · 8 × 9 × 14 in

2 × $218.75 · 4 wk · Due 2027-01-15 · Pending

DR-06 · Flatweave runner$300.00

Charcoal wool · 3 × 9 ft

1 × $300.00 · 4 wk · Due 2027-01-15 · Pending

DR-07 · Recessed drapery track$225.00

Matte bronze · 96 × 1 × 1 in

1 × $225.00 · 3 wk · Due 2027-01-15 · Pending

DR-08 · Pedestal centerpiece$112.50

Matte cream ceramic · 11 Ø × 7 in

1 × $112.50 · 2 wk · Due 2027-01-15 · Pending

Client selection total$20,750.00

Prices are in USD and cover the selections shown. Freight, installation, and tax are quoted separately. Confirm availability before placing orders.

Client selection total$20,750.002 of 18 approved
PROJECT PASS$19 $15.20with LAUNCH20

One spec. Four files.

Review by room, send the purchasing team their schedule, and show exactly what a substitution changes.

  1. Client approval bookRoom specs, client totals, alternate deltas and sign-off
  2. Vendor procurement PDFSKU, finish, dimensions, quantities and trade costs
  3. Native Excel workbookRoom Schedule, Vendor Rollup and Substitutions
  4. Substitution variance PDFOriginal versus alternate client budget and lead time
Compare Project Pass and Studio Pro

Frequently asked questions

What comes in the FF&E pack?

The ZIP includes a priced client approval book, a trade-cost vendor schedule PDF, a three-tab Excel workbook, and a substitution budget and lead-time variance PDF.

Can I see the files before checkout?

Yes. Edit your selections and inspect the watermarked previews. The free Westfield Residence sample ZIP contains the same file types and layout as a custom export.

What does the One-Time Project Pass cover?

One project with up to 100 selections and unlimited revisions. It costs $19 USD, or $15.20 with LAUNCH20. Guest access stays with the browser used for checkout.

How is my sourcing data stored?

Drafts are stored in your browser. Custom documents are generated in server memory after payment authorization. Project bodies and generated files are not saved to the database.

FF&E specification guides

FF&E Schedule Excel & Client Approval PDF MakerBackorder Substitution Approval Sheet for DesignersPlumbing & Lighting Fixture Schedule BuilderHospitality FF&E Procurement Schedule TemplateTrade vs Retail Markup FF&E CalculatorDesignFiles & Aalto Alternative for Small StudiosRoom-by-Room Client FF&E Approval BookVendor & Contractor FF&E Procurement ScheduleFF&E Specification Sheet TemplateResidential Living & Dining FF&E ScheduleFF&E Sourcing Spreadsheet & CSV ImportFF&E Decision Dates and Lead-Time PlanningFF&E Vendor Rollup Excel TemplateFF&E Finish and Fabric Schedule for InteriorsFF&E Client Budget Approval TemplateFF&E Substitution Budget & Lead-Time Variance ReportInterior Design FF&E Procurement HandoffFF&E Approval Revision Checklist